Supported projects

Published export transactions

Project information

If the contract value of a project exceeds EUR 15 million, basic project data are published after a final commitment for cover has been made provided that the exporter has given its consent. This information is brought up to date at the beginning of each month however with a time-lag of three months.

The order values are divided into the following categories:

  • Category 1: up to 15 million euros (no puplication)
  • Category 2: between 15 million euros and 50 million euros
  • Category 3: between 50 million euros and 100 million euros
  • Category 4: between 100 million euros and 200 million euros
  • Category 5: more than 200 million euros

 

Projects supported in previous years can be found in the project archive (German version only). 

Overview of transactions finally adopted in 2025

(Status: February 2026)

December 2025

 

Exporter: Commit Project Partners GmbH, Berlin
Financing institution:Landesbank Hessen-Thüringen, Frankfurt
Project:Airport equipment
Project location:Tashkent
Category:2
Buyer's country:Uzbekistan
Credit period:8 years
Project category according to
Common Approaches:
E
Applied intern. Standards:./.
Environmental, social
and human rights aspects:
./.
Monitoring:No

 

Exporter: Brückner Maschinenbau GmbH, v.d. Brückner Group SE, Siegsdorf
Financing institution:Bayerische Landesbank, Munich
Project:BOPET film production line incl. cutting machines and modernisation of an existing line
Project location:10 km west of Surat
Category:2
Buyer's country:India
Credit period:10 years
Project category according to
Common Approaches:
E
Applied intern. Standards:./.
Environmental, social
and human rights aspects:
Energy consumption, labour conditions
Monitoring:No

 

Exporter: Heinrich Georg GmbH Maschinenfabrik, Kreuztal
Financing institution:UniCredit Bank GmbH, Munich
Project:Machines for the production of transformer cores
Project location:Toronto
Category:2
Buyer's country:Canada
Credit period:8.5 years
Project category according to
Common Approaches:
./.
Applied intern. Standards:./.
Environmental, social
and human rights aspects:
./.
Monitoring:./.

 

November 2025

Exporter: MCA Deutschland GmbH, Frankfurt am Main
Financing institution:Standard Chartered Bank, Singapore
Project type:Rehabilitation of a road
Project location:Province of Mexico
Category:5
Buyer's country:Angola
Credit period:15 years
Project category according to
Common Approaches:
B
International standards applied:IFC Performance Standards (PS)
Environmental, social 
and human rights issues:

Occupational safety, noise, supply of raw materials, economic resettlement, protection of biodiversity

Biodiversity

Monitoring:No

 

Exporter: a German exporter
Financing institution:Commerzbank AG, Frankfurt
Project:Construction of two wind farms
Project location:

3.5 km south of the town of Degirmenbasi and

2.8 km west of the town of Camyurt

Category:2
Buyer's country:Türkiye
Credit period:9 years
Project category according to
Common Approaches:
B
International standards applied:World Bank Safeguard Operational Policies
Environmental, social 
and human rights issues:

Impact on fauna and flora, impact on the local population,

Occupational safety

Monitoring:No

 

Exporter: a German exporter
Financing institution:AKA Ausfuhrkredit-Gesellschaft
Project:Construction of two wind farms
Project location:Cepni and Bayir
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to
Common Approaches:
./.
International standards applied:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: SMS group GmbH, Mönchengladbach
Financing institution:./.
Project:Supply and installation of a thin slab casting/rolling plant
Project location:Jamuria, West Bengal
Category:3
Buyer's country:India
Credit period:Near cash terms
Project category according to
Common Approaches:
./.
International standards applied:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: ANDRITZ Metals Germany GmbH
Financing institution:./.
Project:Cold rolling mill
Project location:Greater Shanghai area
Category:2
Buyer's country:China, VR
Credit period:Near cash terms
Project category according to
Common Approaches:
./.
International standards applied:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: Dieffenbacher GmbH
Financing institution:./.
Project:Delivery of a Fine OSB Machine (Luly 7)
Project location:Guangyuan City, Sichuan Province
Category:2
Buyer's country:China, PR
Credit period:19 month
Project category according to
Common Approaches:
./.
International standards applied:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: Dieffenbacher GmbH
Financing institution:./.
Project:Delivery of a plywood machine (Luli 9)
Project location:Guangyuan City, Sichuan Province
Category:2
Buyer's country:China, PR
Credit period:16 month
Project category according to
Common Approaches:
./.
International standards applied:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

October 2025

Exporter: Textima Export Import GmbH, Berlin
Financing institution:AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt
Project:Supply of components for ships and shipyard equipment for the construction of ships
Project location:Kocaeli
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to
Common Approaches:
./.
International standards applied:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: SMS group GmbH, Mönchengladbach
Financing institution:./.
Project:Aluminium hot strip mill
Project location:Chonqping
Category:2
Buyer's country:China, PR
Credit period:Close to delivery/performance
Project category according to
Common Approaches:
./.
International standards applied:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

September 2025

Exporter: Siemens Energy Global GmbH & Co. KG, Erlangen
Financing institution:Standard Chartered Bank, London DZ Bank AG, Frankfurt am Main Commerzbank AG, Frankfurt am Main
Project:Three 400 KV substations
Project location:Dhefaf Karbala, Al-Karkh and Al-Abbasia
Category:5
Buyer's country:Iraq
Credit period:5 years
Project category according to
Common Approaches:
B
International standards applied:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Occupational safety, pollution prevention, protected areas
Monitoring:No

 

Exporter: Brückner Maschinenbau Gmbh,v.d. Brückner Group SE, Siegsdorf
Financing institution:Landesbank Baden-Württember, Stuttgart
Project:Delivery, installation supervision and commissioning of a plant for the production of BOPP films
Project location:within the city of Manisa
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to
Common Approaches:
E
International standards applied:./.
Environmental, social 
and human rights issues:
Energy efficiency, labour rights and occupational safety
Monitoring:No

 

Exporter: TGM Kanis Turbinen GmbH, Nuremberg
Financing institution:AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt
Project:Solar power plant with battery storage
Project location:Kütahya
Category:3
Buyer's country:Türkiye
Credit period:15 years
Project category according to
Common Approaches:
B
International standards applied:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Labour safety, solar supply chain, workers' rights, resettlement, biodiversity
Monitoring:Yes

 

Exporter: J.M. Voith SE & Co. KG
Financing institution:./.
Project:Engineering and delivery of main components for a paper machine
Project location:Yiwu City, Zhejiang
Category:2
Buyer's country:China, PR
Credit period:close to delivery/performance
Project category according to
Common Approaches:
K
International standards applied:./.
Environmental, social 
and human rights issues:
Waste water, occupational safety, public health and safety
Monitoring:No

 

Exporter: various
Financing institution:Banco Santander S.A.
Project:Shopping Line
Project location:./.
Category:3
Buyer's country:Netherlands
Credit period:5 years
Project category according to
Common Approaches:
./.
International standards applied:./.
Environmental, social 
and human rights issues:
./.
Monitoring:Yes

August 2025

Exporter: Dieffenbacher GmbH Maschinen- und Anlagenbau, Eppingen
Financing institution:./.
Project:Equipment for the production of MDF boards
Project location:Debre Birhan Town, Ethiopia
Category:2
Buyer's country:Ethiopia
Credit period:Close to delivery / performance
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: SMS group GmbH, Mönchengladbach
Financing institution:Crédit Agricole Corporate and Investment Bank
Project:Cold rolling complex for green steel
Project location:Lulea / Sweden
Category:5
Buyer's country:Sweden
Credit period:11 years
Project category according to
Common Approaches:
E
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:No

 

Exporter: SMS group GmbH, Mönchengladbach
Financing institution:./.
Project:Rail and profile rolling mill
Project location:Binh Thuan/ Quang Ngai
Category:3
Buyer's country:Vietnam
Credit period:Close to delivery / performance
Project category according to
Common Approaches:
K
International standards:./.
Environmental, social 
and human rights issues:
Occupational safety, air and noise emissions
Monitoring:No

 

Exporter: SMS group GmbH, Mönchengladbach
Financing institution:./.
Project:Core components for a cold rolling mill
Project location:Vijayanagar, Karnataka
Category:2
Buyer's country:India
Credit period:Close to delivery / performance
Project category according to
Common Approaches:
K
International standards:./.
Environmental, social 
and human rights issues:
Occupational safety
Monitoring:No

 

Exporter: J.M. Voith SE & Co KG, Heidenheim
Financing institution:./.
Project:Paper machine
Project location:Jining City / Shandong
Category:2
Buyer's country:China, PR
Credit period:Close to delivery
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

July 2025

Exporter: a German exporter
Financing institution:Commerzbank AG, Frankfurt
Project:Plants for the production of activated carbon from biomass
Project location:Adana
Category:3
Buyer's country:Türkiye
Credit period:10 years
Project category according to
Common Approaches:
B
International standards:World Bank
Environmental, social 
and human rights issues:
Sensitive areas, air emissions, wastewater, supply chain
Monitoring:./.

 

Exporter: ACENDIS Healthcare GmbH, Hanover
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Hospital equipment
Project location:Istanbul in the district of Göztepe
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS)/World Bank
Environmental, social 
and human rights issues:
Occupational safety, waste and hazardous substances
Monitoring:./.

 

Exporter: Liebherr-Werk Ehingen GmbH, Ehingen
Financing institution:AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt
Project:Mobile cranes and rough terrain cranes
Project location:various
Category:2
Buyer's country:Saudi Arabia
Credit period:10 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Supplies and services in connection with the construction of a new gas-fired power plant
Project location:6 km east of Jizzakh City, Sharof Rashidov district
Category:4
Buyer's country:Uzbekistan/Türkiye
Credit period:10 years
Project category according to
Common Approaches:
A
International standards:IFC Performance Standards (PS)/World Bank
Environmental, social 
and human rights issues:
Air emissions, water use, occupational safety
Monitoring:./.

 

Exporter: two German exporters
Financing institution:Bayerische Landesbank, Munich
Project:Expansion of a wind farm including construction of a battery storage system and expansion of a wind farm
Project location:"Ege": In the province of Izmir, approx. 20km west of the city of Izmir, "Göktepe": In the province of Yalova, approx. 3 km north of the city of Armutlu
Category:4
Buyer's country:Türkiye
Credit period:19 years
Project category according to
Common Approaches:
B
International standards:IFV Performance Standards (PS)/World Bank
Environmental, social 
and human rights issues:
Impact on fauna and flora, impact on the local population
Monitoring:./.

 

Exporter: Uhde High Pressure Techhnologies GmbH, v.d.thssenkrupp / Uhde GmbH, Dortmund
Financing institution:./.
Project:High pressure printing equipment for two polymer lines
Project location:Qinzhou
Category:2
Buyer's country:China, PR
Credit period:close to delivery
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

June 2025

Exporter: a German exporter
Financing institution:Bank of America Europe Designated Activity Company, Dublin
Project:Clinker production line
Project location:550 km west of Midland, Texas, United States
Category:4
Buyer's country:United States
Credit period:10 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS)/World Bank
Environmental, social 
and human rights issues:
Energy consumption, air emissions
Monitoring:No

 

Exporter: Tadano Demag GmbH, Zweibrücken
Financing institution:ODDO BHF SE, Frankfurt
Project:Lattice boom crawler cranes
Project location:Cyprus/Belgium/Qatar, UAE
Category:2
Buyer's country:Cyprus
Credit period:8 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: KRONES AG, Neutraubling
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Beverage bottling plants
Project location:Buxar, Bihar
Category:2
Buyer's country:India
Credit period:10 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: KHS GmbH, Dortmund
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:

Delivery, assembly, commissioning and supervision of assembly of two

PET filling lines for carbonated soft drinks

Project location:Buxar, Bihar
Category:1
Buyer's country:India
Credit period:10 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

May 2025

Exporter: a German exporter
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Wind turbines
Project location:Baltic Sea
Category:5
Buyer's country:Poland
Credit period:22 years
Project category according to
Common Approaches:
A
International standards:IFC Performance Standards
Environmental, social 
and human rights issues:
Economic resettlement, biodiversity
Monitoring:Yes

 

Exporter: one German exporter
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Wind turbines
Project location:Baltic Sea
Category:5
Buyer's country:Poland
Credit period:22 years
Project category according to
Common Approaches:
A
International standards:IFC Performance Standards
Environmental, social 
and human rights issues:
Economic resettlement, biodiversity
Monitoring:Yes

 

Exporter: Nordex Energy SE & Co KG, Hamburg
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction of a wind farm
Project location:25 km south-west of the city of Karaman
Category:3
Buyer's country:Türkiye
Credit period:11.5 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Biodiversity, land procurement, occupational safety
Monitoring:Yes

 

Exporter: Nordex Energy SE & Co KG, Hamburg
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction of a wind farm
Project location:55 km east of the city of Yozgat
Category:2
Buyer's country:Türkiye
Credit period:11.5 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Land procurement, occupational safety, biodiversity, cultural heritage
Monitoring:Yes

 

Exporter: one German exporter
Financing institution:AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt
Project:Construction of a wind farm
Project location:approx. 100 km southwest of the city of Mersin in the province of the same name
Category:2
Buyer's country:Türkiye
Credit period:12 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Impact on fauna and flora, impact on the local population
Monitoring:No

 

Exporter: one German exporter
Financing institution:Deutsche Leasing Finance GmbH, Bad Homburg
Project:BOPET production line
Project location:approx. 10 km east of the city of Yangzhou
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Employee rights, occupational safety, resource efficiency and pollution prevention
Monitoring:No

 

Exporter: one German exporter
Financing institution:Commerzbank AG, Frankfurt
Project:Nonwovens plant
Project location:Cosmopolis/SP
Category:2
Buyer's country:Brazil
Credit period:15 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: Trützschler Group SE, Mönchengladbach and one other exporter
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Spinning mills
Project location:

Location 1: 15 km northwest of Diyarbakir

Site 2: 1 km south of Kahramanmaras

Category:3
Buyer's country:Türkiye
Credit period:9.5 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Occupational safety, working conditions Resource efficiency
Monitoring:No

April 2025

Exporter: Outotec GmbH & Co. KG
Financing institution:KfW IPEX-Bank GmbH
Project:Sulphuric acid and gas purification plant for a copper smelter
Project location:Almalyk, approx. 65 km south of Tashkent
Category:5
Buyer's country:Uzbekistan
Credit period:close to delivery/performance
Project category according to
Common Approaches:
K
International standards:./.
Environmental, social 
and human rights issues:
Occupational safety, waste water, air emissions
Monitoring:./.

 

Exporter: Liebherr-Werk Ehingen GmbH
Financing institution:ODDO BHF SE, Frankfurt
Project:Mobile cranes
Project location:various
Category:3
Buyer's country:Saudi Arabia
Credit period:8 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: a German exporter
Financing institution:Commerzbank AG
Project:Expansion of a wind farm
Project location:In the province of Kirikkale, approx. 13 km southwest of Keskin
Category:3
Buyer's country:Türkiye
Credit period:14 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Impact on fauna and flora, impact on the local population
Monitoring:./.

 

Exporter: Uhde Inventa-Fischer GmbH
Financing institution:./.
Project:Polyamide plant
Project location:Hai'an City
Category:2
Buyer's country:China, PR
Credit period:close to delivery
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

March 2025

Exporter: Brückner Maschinenbau GmbH, v.d. Brückner Group SE, Siegsdorf
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Line for the production of biaxially oriented polypropylene film (BOPP film)
Project location:./.
Category:2
Buyer's country:India
Credit period:8 years
Project category according to
Common Approaches:
C
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:No

 

Exporter: a German exporter
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Pasteurizer, PET and can waste equipment
Project location:Eregli/ Konya, Hendek/ Sakarya and Adana
Category:2
Buyer's country:Türkiye
Credit period:8 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: Thies GmbH & Co KG, Coesfeld
Financing institution:./.
Project:Textile dyeing machines
Project location:Tay Ninh
Category:2
Buyer's country:Vietnam
Credit period:close to delivery/performance
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

February 2025

Exporter: HOMAG GmbH, v.d.Dürr AG, Bietigheim-Bissingen
Financing institution:Commerzbank AG, Frankfurt
Project:Wood processing equipment
Project location:Shouguang, Ji'an, Yongzhou
Category:3
Buyer's country:China, PR
Credit period:9 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Timber supply chain, resettlement
Monitoring:No

 

Exporter: HOMAG GmbH, v.d.Dürr AG, Bietigheim-Bissingen
Financing institution:Commerzbank AG, Frankfurt
Project:Wood processing equipment
Project location:Shouguang, Ji'an, Yongzhou
Category:3
Buyer's country:China, PR
Credit period:9 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Timber supply chain, resettlement
Monitoring:No

 

Exporter: HOMAG GmbH, v.d.Dürr AG, Bietigheim-Bissingen
Financing institution:Commerzbank AG, Frankfurt
Project:Wood processing equipment
Project location:Shouguang, Ji'an, Yongzhou
Category:3
Buyer's country:China, PR
Credit period:9 years
Project category according to
Common Approaches:
B
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Timber supply chain, resettlement
Monitoring:No

 

Exporter: HOMAG GmbH, v.d.Dürr AG, Bietigheim-Bissingen
Financing institution:Commerzbank AG, Frankfurt
Project:Wood processing equipment
Project location:Sichuan
Category:3
Buyer's country:China, PR
Credit period:9 years
Project category according to
Common Approaches:
A
International standards:IFC Performance Standards (PS) / World Bank
Environmental, social 
and human rights issues:
Timber supply chain, resettlement
Monitoring:Yes

 

Exporter: Liebherr-Werk Ehingen GmbH, Ehingen
Financing institution:./.
Project:Delivery of crawler and mobile cranes
Project location:Mobile goods without defined location or area of use
Category:2
Buyer's country:Netherlands
Credit period:8 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social 
and human rights issues:
./.
Monitoring:./.

 

Exporter: SMS group GmbH, Mönchengladbach
Financing institution:./.
Project:Electric steel mill and rolling mill
Project location:approx. 2km east of Pindamonhangaba
Category:4
Buyer's country:Brazil/Mexico
Credit period:close to delivery/performance
Project category according to
Common Approaches:
K
International standards:./.
Environmental, social 
and human rights issues:
Energy efficiency, water consumption, emissions and occupational safety
Monitoring:No

 

Exporter: J.M. Voith SE & Co. KG
Financing institution:./.
Project:Paper mill
Project location:approx. 2km south of Dschidda
Category:4
Buyer's country:Saudi Arabia
Credit period:close to delivery/performance
Project category according to
Common Approaches:
K
International standards:./.
Environmental, social 
and human rights issues:
Water consumption, wastewater, employee rights and occupational safety
Monitoring:No

January 2025

Exporter: Commit Project Partners GmbH, Berlin
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt am Main
Project:Construction of a production facility for the manufacture of spare parts for commercial vehicles
Project location:Samsun
Category:3
Buyer's country:Türkiye
Credit period:10 years
Project category according to
Common Approaches:
B
International standards:World Bank Safeguard Operational (OP)
Environmental, social 
and human rights issues:
Emissions, water, waste
Monitoring:No
View the selection and stay informed!
Subscribe to our newsletter and receive regular updates and event tips on federal export credit guarantees directly in your inbox.
In order to provide you with the desired content, we ask for your permission to process and store your data. For more information, please see our privacy policy..
Receiving EKG News is, of course, free of charge, non-binding, and can be canceled at any time.
I do not wish to receive information via newsletter.
×